Pumping and Placement of Cellular Concrete
Pumping Cellular Concrete In the majority of geotechnical cellular concrete projects, pumping is the preferred—

Production and Quality Control in Cellular Concrete
Production and Quality Control Cellular concrete can be produced many different ways. For any given

Utility Trench Fill
Project at a Glance Material Placed: 120 yards³ (92 m³) Material Density: 40 pcf (641 kg/m³) Base

Sliplining
Project at a Glance Material Placed: 250 yards³ (192 m³) Material Density: 30 pcf (481 kg/m³) Base

Municipal Water Utility Void Fill
Project at a Glance Material Placed: 95 yards³ (73 m³) Material Density: 40 pcf (641 kg/m³) Base

Multi-Story Floor Leveling
Project at a Glance Material Placed: 4000 yds³ (3058 m³) Material Density: 30 – 35 pcf (480

Floating Staircase
Project at a Glance Material Placed: 3 yards³ (2.3 m³) Material Density: 118 PCF (1890 kg/m³) Base

Backfill in a Mine
Project at a Glance Material Placed: 4500 yards³ (3441 m³) Material Density: 35 pcf (561 kg/m³) Base

Water Main Abandonment
Project at a Glance Material Placed: 23 yards³ (17.5 m³) Material Density: 30 pcf (480 kg/m³) Base